Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    How the Loosdrecht Lakes Became the Netherlands’ Most Fascinating Residential Landscape

    July 31, 2026

    Tashkent’s Modernist Architecture Joins UNESCO World Heritage List

    July 31, 2026

    Architecture Is Growing Up with Gen Z

    July 30, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    ParametricParametric
    Subscribe
    ParametricParametric
    Home»Projects»Architecture»Rossetti and WSP to Lead Arthur Ashe Stadium Renovation After 2025 US Open
    Architecture

    Rossetti and WSP to Lead Arthur Ashe Stadium Renovation After 2025 US Open

    Isha ChaudharyBy Isha ChaudharySeptember 11, 2025Updated:July 6, 202605 Mins Read0 Views
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Reddit Email
    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The U.S. Tennis Association has signed off on a major, multi-year refurbishment of Arthur Ashe Stadium that will begin once the 2025 US Open finishes. The program is led by ROSSETTI (the stadium’s original architect) together with WSP as the engineering partner. The work is part of an $800 million campus-wide transformation that aims to modernize seating, hospitality, player facilities, and public amenities while keeping the stadium operational through the 2025 and 2026 tournaments.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    Arthur Ashe Stadium Renovations Aligned With US Open Schedule

    The redesign is framed around three practical goals: improving the fan experience, upgrading player and back-of-house facilities, and increasing premium-revenue capacity without compromising the event schedule. Major pieces announced so far include a new grand entrance, about 2,000 additional courtside seats, two new levels of luxury suites, wider concourses, and upgraded food/retail provisions, plus a two-story Player Performance Center. The USTA says the work will be phased so competition and fan access during summer tournaments are preserved.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    WSP’s public project notes emphasize that structural work is being sequenced around the tournament calendar. Most heavy structural work is slated in the short windows between events (the term used by WSP is that major structural scope is concentrated between the 2025 and 2026 US Opens), with finishes, MEP, and fit-out continuing afterward. That phasing is essential because Arthur Ashe must host matches while the campus is being reimagined.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    ROSSETTI is serving as the principal design architect, returning as the lead on the stadium renovation. The firm has a long-standing history with the National Tennis Center, having acted as the original architect and previously overseeing the design of the retractable roof project.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    WSP is taking charge of structural engineering and related services for the renovation program. Their responsibilities include project sequencing, structural assessments, and the engineering work necessary to carry out upgrades without causing major interruptions to tournament schedules. The USTA remains the owner and primary funder of the program, with financing coming entirely from private sources.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    It is worth noting that the earlier roof and systems work relied on several specialized contractors. Hunt Construction/AECOM acted as the design-builder, Canam and Cast Connex provided steel components, and membrane specialists handled the roof installation. These firms are mentioned as precedents to highlight the technical expertise involved in prior phases. The new renovation will disclose its contract awards and delivery partners as each phase of the project is bid.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    Premium Seating, Player Center, and Fan Upgrades

    The planned renovation of Arthur Ashe Stadium includes a mix of premium enhancements and general facility improvements aimed at elevating the experience for both fans and players.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    Beyond premium seating, the stadium’s concourse areas will be expanded and reconfigured, allowing for smoother circulation, reduced congestion, and improved access to upgraded dining and retail options. This adjustment is designed to ease pinch points that have historically created bottlenecks during peak crowd movement.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    For athletes, the centerpiece of the renovation is the construction of a two-story Player Performance Center, valued at around $250 million. The new facility will feature state-of-the-art training spaces, dining areas, and enhanced locker and therapy rooms, providing players with significantly improved preparation and recovery amenities.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    While these initiatives clearly add high-value premium inventory, the USTA emphasizes that the project also focuses on enhancing baseline amenities for all spectators. Wider concourses, more diverse food offerings, and improved sightlines are among the recurring themes highlighted in official project descriptions. Together, these upgrades aim to ensure that the fan experience at the US Open is elevated across all ticket categories.

    Why Engineering Challenges Matter

    Arthur Ashe sits on difficult ground historically, the Corona ash dump, so past interventions have been designed to avoid loading the original bowl unnecessarily. When ROSSETTI and WSP added the stadium’s retractable roof in the previous program, they used a lightweight, self-supporting roof that stands independently of the seating bowl. That strategy, independent columns with deep foundations carrying the roof, rather than adding weight to the original structure, will influence how new work is sequenced and how structural tie-ins are handled during this renovation.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    The roof is a fabric (PTFE) membrane stretched over a steel frame, supported on eight perimeter steel columns, and was engineered specifically to minimize added weight and limit disturbance to underground utilities. The stadium’s foundation and soil profile continue to shape what can be done and how quickly. 

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open
    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    USTA and the project team are clear that construction will be phased to preserve the 2025 event and to minimize disruption to the 2026 tournament calendar. In practice, that means heavier, more intrusive structural work is scheduled in the short off-season windows and between tournaments; finishes, systems commissioning, and hospitality fit-outs roll on across the two-year window.

    Arthur Ashe Stadium Renovations-ROSSETTI-WSP-US Open

    Arthur Ashe Stadium Renovation – Project details

    Location: Corona Park, Queens, New York, United States
    Project: Arthur Ashe Stadium Renovation (part of $800M campus-wide program)
    Architect: ROSSETTI (Design Architect)
    Engineer: WSP (Structural Engineering & Sequencing)
    Owner/Partner: U.S. Tennis Association (USTA)
    Client: USTA (privately financed)
    Timeline: Begins after 2025 US Open → Major structural work 2025–2026 → Completion targeted for 2027

    Image Credit: © ROSSETTI

    Arthur Ashe Stadium ROSSETTI United States US Open USTA WSP
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Isha Chaudhary

    Isha Chaudhary is an architecture writer who follows and writes about current trends and emerging discussions in architecture, with a focus on design, technology, and place-making.

    Related Posts

    Where “The Odyssey” Was Filmed: The Architecture Behind Nolan’s Troy

    July 29, 2026

    Miami Bay Towers Brings Four Sculptural Forms to Biscayne Bay

    July 26, 2026

    CRA and GS E&C Reveal Climate-Adaptive Residential Tower for Flood-Prone Seoul

    July 23, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Demo
    Top Posts

    FIFA World Cup 2030 Stadium Guide

    July 26, 202612 Views

    Harvard Unveils Shape-Shifting Knitted Fabric with Built-In Sensors

    July 26, 202612 Views

    How the Loosdrecht Lakes Became the Netherlands’ Most Fascinating Residential Landscape

    July 31, 20263 Views

    Why Clearing the Room First Changes Every Renovation Decision You Make

    July 27, 20263 Views
    Don't Miss

    How the Loosdrecht Lakes Became the Netherlands’ Most Fascinating Residential Landscape

    By Isha ChaudharyJuly 31, 2026

    What appears to be an AI-generated landscape has become one of the internet’s latest architectural…

    Tashkent’s Modernist Architecture Joins UNESCO World Heritage List

    July 31, 2026

    Architecture Is Growing Up with Gen Z

    July 30, 2026

    Populous to Shape Frankfurt’s Next Major Sports and Entertainment Arena

    July 30, 2026

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    Demo

    Recent Posts

    • How the Loosdrecht Lakes Became the Netherlands’ Most Fascinating Residential Landscape
    • Tashkent’s Modernist Architecture Joins UNESCO World Heritage List
    • Architecture Is Growing Up with Gen Z
    • Populous to Shape Frankfurt’s Next Major Sports and Entertainment Arena
    • Chile’s 2026 National Architecture Prize Awarded to Pritzker Laureates Alejandro Aravena and Smiljan Radić

    Recent Comments

    No comments to show.
    About Us
    About Us

    Your source for the lifestyle news. This demo is crafted specifically to exhibit the use of the theme as a lifestyle site. Visit our main page for more demos.

    We're accepting new partnerships right now.

    Email Us: [email protected]
    Contact: +1-320-0123-451

    Our Picks

    How the Loosdrecht Lakes Became the Netherlands’ Most Fascinating Residential Landscape

    July 31, 2026

    Tashkent’s Modernist Architecture Joins UNESCO World Heritage List

    July 31, 2026

    Architecture Is Growing Up with Gen Z

    July 30, 2026
    Most Popular

    FIFA World Cup 2030 Stadium Guide

    July 26, 202612 Views

    Harvard Unveils Shape-Shifting Knitted Fabric with Built-In Sensors

    July 26, 202612 Views

    How the Loosdrecht Lakes Became the Netherlands’ Most Fascinating Residential Landscape

    July 31, 20263 Views

    Archives

    • July 2026
    • June 2026
    • May 2026
    • April 2026
    • March 2026
    • February 2026
    • January 2026
    • December 2025
    • November 2025
    • October 2025
    • September 2025
    • August 2025
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • August 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • November 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018

    Categories

    • 3D Printing
    • Ads
    • Archipreneurs
    • Architects
    • Architecture
    • Architecture & Design
    • Architecture News
    • Articles
    • Artificial Intelligence
    • BIM / AEC
    • Books
    • Case Study
    • CDNext
    • CDNEXT Recordings
    • City Guide
    • Competitions
    • Design
    • Digital Art
    • Digital Members
    • Events
    • Fashion
    • Geography
    • Installation
    • Interior
    • Interviews
    • Jobs
    • landscape
    • Landscape Architecture
    • Landscape Design
    • memorial
    • Metaverse
    • Opinions
    • PA Quotes
    • PA Talks
    • PAACADEMY
    • Pavilion
    • podcasts
    • Products
    • Projects
    • Robotics
    • Space Architecture
    • Studio Recordings
    • Studio Workshops
    • Sustainability
    • Technology
    • Tools
    • Urbanism
    • Videos
    • Workshops
    Facebook X (Twitter) Instagram Pinterest Dribbble
    © 2026 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.